Professional China Process Supporting Pipeline Connection - Cooling water system – TekMax

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We have been ready to share our knowledge of internet marketing worldwide and recommend you suitable merchandise at most aggressive rates. So Profi Tools present you very best price of money and we are ready to develop alongside one another with Air Exhaust System, Intelligent Production Process System, 30300,000 Dust Purification Level, Leading the trend of this field is our persistent goal. Providing first class products is our aim. To create a beautiful future, we would like to cooperate with all friends at home and abroad. Should you have any interest in our products, please do not hesitate to contact us.
Professional China Process Supporting Pipeline Connection - Cooling water system – TekMax Detail:

 

  The process cooling water system consists of the following parts: chillers, pumps, heat exchangers, water tanks, filters, and process equipment.

   Water chiller: Provide cold source for cooling water system.

  Water pump: pressurize the water to ensure its circulation in the cooling system.

   Heat exchanger: Use this equipment to exchange heat between the chilled water system and the chilled water system to transfer the heat generated at the load end of the system to the chilled water system. There are many types of heat exchangers, which can be divided into shell-and-tube type, plate type, plate-fin type, heat pipe type, etc. according to their form. In comparison, the plate heat exchanger has the advantages of a small footprint and a large heat transfer area. Considering the cost characteristics of the space and area of ​​the semiconductor plant, equipment with a small footprint is preferred to save land area and engineering cost.

 

  Water tank: The water tank in the open system mainly plays the role of supplementing water source. The water tank in the closed system needs to choose an expansion water tank. The expansion water tank has three functions. One is to contain and compensate the expansion and contraction of the water in the system; the other is to provide a stable pressure to the closed circulating water system and play a role in system stabilization; The third is as an indication of the system water pump, usually the expansion tank sends a signal to start or shut down the system water pump.

 

   filter: filter out the solid particleThere are two relatively independent systems in the process cooling water system, chilled water and cooling water. The chilled water is provided by the chiller, and the chilled water and the cooling water exchange heat to cool the cooling water and reduce the temperature of the equipment. The water is pumped from the production equipment through the water pump to the heat exchanger to ensure the temperature of the process cooling water by controlling the amount of chilled water, and then sent to the production line equipment after passing the filter, and then back to the water pump. The formation process cooling water repeatedly circulates. The chilled water is directly returned to the chiller.


Product detail pictures:

Professional China  Process Supporting Pipeline Connection - Cooling water system – TekMax detail pictures


Related Product Guide:

We regularly perform our spirit of ''Innovation bringing progress, Highly-quality making certain subsistence, Administration marketing benefit, Credit score attracting customers for Professional China Process Supporting Pipeline Connection - Cooling water system – TekMax , The product will supply to all over the world, such as: Guatemala, Senegal, Macedonia, With a fully integrated operation system, our company has won a good fame for our high quality goods, reasonable prices and good services. Meanwhile, we have established a strict quality management system conducted in material incoming, processing and delivery. Abiding by the principle of "Credit first and customer supremacy", we sincerely welcome clients from home and abroad to cooperate with us and advance together to create a brilliant future.
  • The sales manager is very patient, we communicated about three days before we decided to cooperate, finally, we are very satisfied with this cooperation!
    5 Stars By Lena from Israel - 2018.06.30 17:29
    We have been cooperated with this company for many years, the company always ensure timely delivery ,good quality and correct number, we are good partners.
    5 Stars By Meroy from Bolivia - 2017.06.25 12:48
    Write your message here and send it to us